Action Plan
Your prioritised next steps. 1 of 8 actions are complete.
- High priorityOpportunity: Water Innovation FundDue 19 Sept 2026
Secure a UK utility partner for the Water Innovation Fund
The call requires a named UK utility or infrastructure partner. Confirm one partner before drafting the proposal.
Why it matters: Highest-value match in your radar (92) and the partner requirement is the only blocking factor.
Checklist
Owner Elin Sandberg · created 20 Aug 2026 · updated 5 Sept 2026
Demonstration data. Verify details before acting.
- High priorityOpportunity: London Net Zero AcceleratorDue 15 Sept 2026
Decide on the London Net Zero Accelerator application
Application closes 19 September and requires two customer references.
Why it matters: Fastest route to the local presence your readiness assessment flags as your largest gap.
Checklist
Owner Elin Sandberg · created 4 Aug 2026 · updated 2 Sept 2026
Demonstration data. Verify details before acting.
- High priorityOpportunity: Nordic trade missionDue 12 Sept 2026
Register for the Nordic trade mission to London
Places are allocated first come, first served and close on 15 September.
Why it matters: Pre-arranged buyer meetings with utilities and boroughs shorten your route to pilots.
Checklist
Owner Johan Lind · created 7 Aug 2026 · updated 6 Sept 2026
Demonstration data. Verify details before acting.
- High priorityOpportunity: Utility innovation pilot callDue 28 Sept 2026
Submit a pilot proposal to the regional utility
Two-page proposal plus data-security questionnaire.
Why it matters: The utility raised its resilience capital plan by 18%, with a named innovation allocation.
Checklist
Owner Elin Sandberg · created 27 Aug 2026 · updated 7 Sept 2026
Demonstration data. Verify details before acting.
- Medium priorityIntelligence: Competitor opens London officeDue 22 Sept 2026
Decide whether to form a UK entity before the borough tender
The borough tender requires UK invoicing. Either form an entity or bid through a UK prime contractor.
Why it matters: A comparable competitor has just opened a London office and hired a country manager.
Checklist
Owner Elin Sandberg · created 28 Aug 2026 · updated 3 Sept 2026
Demonstration data. Verify details before acting.
- Medium priorityIntelligence: Metering reporting consultationDue 24 Sept 2026
Respond to the metering standards consultation
Short technical response on measurement practicality, closing 26 September.
Why it matters: The resulting standard will shape procurement requirements you must meet from 2027.
Checklist
Owner Unassigned · created 16 Aug 2026 · updated 16 Aug 2026
Demonstration data. Verify details before acting.
- Medium priorityEcosystem: London water systems research centreDue 3 Oct 2026
Request an introduction to the London research centre
Introductory call about the industrial collaboration call and test-rig access.
Why it matters: Supports your research partnership objective and adds independent validation for bids.
Checklist
Owner Maja Ek · created 30 Aug 2026 · updated 1 Sept 2026
Demonstration data. Verify details before acting.
Progress
1
Planned
1
In progress
1
Completed